Run the merge gate only for changes its tests read #7
@@ -460,13 +460,6 @@ tokens add cost in proportion to the output.
|
||||
almost always costs an allocation too (a lost pre-size, a per-item map, an extra
|
||||
copy). The benchmark suite (see Development) reports time for a human, not as a
|
||||
pass/fail gate.
|
||||
- **The gate runs only when something it consumes changes.** A PR that touches
|
||||
none of the Go and module files, the Dockerfile, `.dockerignore`, the
|
||||
workflow, the shipped data nor the README skips `docker build` and passes
|
||||
as-is — those are what the build feeds or the tests read (`data_test.go` and
|
||||
`loading_test.go` load `data/`, `readme_test.go` renders every README
|
||||
example), so any other change is a verdict already decided, and waiting would
|
||||
be idle. The check still reports success, so the merge gate stays whole.
|
||||
|
||||
## Development
|
||||
|
||||
|
||||
Reference in New Issue
Block a user