From 1fa39a6b104cca4cfb2e0a8ec8d0f4b2cfc87a84 Mon Sep 17 00:00:00 2001 From: Lilleman auf Larv Date: Sat, 17 Oct 2026 21:17:35 +0200 Subject: [PATCH] Record that each release's scoring run is done twice to check the paired ruling's assumption --- docs/decisions.md | 4 +++- 1 file changed, 3 insertions(+), 1 deletion(-) diff --git a/docs/decisions.md b/docs/decisions.md index 000bfd26..3540a729 100644 --- a/docs/decisions.md +++ b/docs/decisions.md @@ -76,10 +76,12 @@ Valid while the ladder orders its rungs by competence. ## review: the comprehension check records how hard a project is to read and blocks no merge: a paired ruling against the last measured commit where the architecture pass ran, and the four-seat scoring run when a release's items run out or an item names the floor -2026-10-08, lilleman. Serves goals 1.1 and 1.4. Two independent four-seat runs moved up to 0.4 on near-identical code, so a fall within that noise forced rounds that changed nothing (PR #224). A seat reading both versions judges the difference on the same material, so the noise the versions share cancels. No conventional significance level lets a sign test settle with four votes, so the human chose a lead of two votes over every other ruling, same included. Two seats that agree settle it, so a PR that leaves the reading as it was costs two seats. A third seat alone can never settle it, so the third and fourth launch together. The human chose the last measured commit on the architect's finding that with a merge base as the base, chunks without an architecture pass, and a suspended restructure's steps, could each lower comprehension unseen. Reading the default branch one merged change at a time keeps the rule working for merge commits and squash merges alike. The scoring run also runs on a chunk shipping an item that names the floor, so the chunk that lifts a project to the floor can prove it. A chunk that removes a release's last item without shipping it runs it too, so no release ends unmeasured. Valid while seats reading both versions agree more often than two absolute runs do; `larv-review agreement` counts both from the history, and each scoring run checks it. +2026-10-08, lilleman. Serves goals 1.1 and 1.4. Two independent four-seat runs moved up to 0.4 on near-identical code, so a fall within that noise forced rounds that changed nothing (PR #224). A seat reading both versions judges the difference on the same material, so the noise the versions share cancels. No conventional significance level lets a sign test settle with four votes, so the human chose a lead of two votes over every other ruling, same included. Two seats that agree settle it, so a PR that leaves the reading as it was costs two seats. A third seat alone can never settle it, so the third and fourth launch together. The human chose the last measured commit on the architect's finding that with a merge base as the base, chunks without an architecture pass, and a suspended restructure's steps, could each lower comprehension unseen. Reading the default branch one merged change at a time keeps the rule working for merge commits and squash merges alike. The scoring run also runs on a chunk shipping an item that names the floor, so the chunk that lifts a project to the floor can prove it. A chunk that removes a release's last item without shipping it runs it too, so no release ends unmeasured. Valid while seats reading both versions agree more often than two absolute runs do. 2026-10-13, lilleman. No published study validates simulated reader panels as a measure of how easy code is to understand, and no test of whether the panel's signal beats its noise has run. So no ruling, score or floor blocks a merge. The runs go on, so the history keeps the scores and the places the seats found hard, for later measurement. The architect, the stability reviewer and a session filing an item read the newest places, since those places are what a chunk can improve. With nothing to block, the check runs once per chunk, on the branch as review left it, in place of a run in each architecture round and a rescore after later commits. A fallen dimension no longer calls the four scoring seats either: their scores only decided the block. The base is now the newest merged change that adds any ruling or scoring run: with worse rulings merging, a base left behind them would charge one chunk's ruling with earlier chunks' falls. The newest places are the newest scoring run's and each later ruling's places a seat voted worse, so they change with each ruling. A chunk that leaves a touched place as hard says why in its PR summary, not in a decline's record, which would outlive the place. +2026-10-17, lilleman. Serves goal 1.1. Nothing checked that validity condition. The history's successive scoring runs of one PR read changed code, not near-identical code, so they cannot stand for two absolute runs. So each release's scoring run is done twice on the same head, the second recorded under ` rerun at `, and `larv-review agreement` compares two rates: how often Mid A and the inherited architect vote alike overall in paired rulings, and how often their overall scores move alike between two scoring runs on one commit. It gives no verdict until the history holds 10 such pairs of runs, as `score-outcomes` waits for 10 chunks before it shows a median. The human chose the second run's cost, four more seats per release (goal 1.4), over a weaker check on the old pairs. + ## review: a project decision may suspend the comprehension check for the plan items it names 2026-10-04, lilleman. Serves goal 1.4. In a restructure, each step's scoring run measures code the next step deletes. It costs a run and, below the floor, blocks the step, yet says nothing about what the restructure buys. The scoring run after the last step measures that. 2026-10-08: the paired ruling replaced the scoring run in most chunks, and the suspension covers it too; the ruling after the last step compares with the commit measured before the first step. 2026-10-13, lilleman: the comprehension check blocks nothing now, so a suspension saves only the runs. Valid while such a decision names its items and the plan item that ends it.