From 4fbb0ede2d2150fde0f1bfea48518bff996b032c Mon Sep 17 00:00:00 2001 From: Lilleman auf Larv Date: Wed, 25 Nov 2026 23:00:46 +0100 Subject: [PATCH] Keep the routing ladder, the steps and the delegation rule against the calls of 2026-11-25 --- docs/decisions.md | 2 ++ 1 file changed, 2 insertions(+) diff --git a/docs/decisions.md b/docs/decisions.md index 2442b5a4..5cdd53b6 100644 --- a/docs/decisions.md +++ b/docs/decisions.md @@ -726,6 +726,8 @@ A project's rung is its model's cheapest rung, which for Opus 5.5 is its default 2026-11-23, lilleman kept the ladder and the steps, settling two calls raised on the routing figures measured at 2026-11-23T15:40:14Z: chunks routed onto Opus 5.5 at medium took more review rounds past each pass's first, and more unfinished verdicts, than chunks routed onto Fable 5.2 at low. The figures came from 124 chunks finished since the 2026-11-17 reset. The 24 chunks started on Opus 5.5 at medium took a mean 0.7 rounds, 0.4 unfinished verdicts and 0.5 later fixes (18 known); the 11 started on Fable 5.2 at low took 0.3, 0.0 and 0.0 (10 known). Fable 5.2 at low has 6 chunks above the 5 a call needs, and Opus 5.5 at medium costs less per task, $2.45 against $3.10 on the 2026-11-11 index (goal 1.4). The later fixes lean towards Fable 5.2 at low, and the call doesn't count them. lilleman had kept the steps against such gaps on 2026-10-31 and 2026-11-18. +2026-11-25, lilleman kept the ladder, the steps and the delegation rule, settling the same two calls as on 2026-11-23, raised again on the routing figures measured at 2026-11-25T21:54:59Z. The figures came from 141 chunks finished since the 2026-11-17 reset. The 24 chunks started on Opus 5.5 at medium took a mean 0.7 review rounds past each pass's first, 0.4 unfinished verdicts and 0.5 later fixes (18 known); the 16 started on Fable 5.2 at low took 0.2, 0.2 and 0.0 (14 known). The figures compare the old steps with the new ones. By a count of the archive's files by modification time, every chunk started on Opus 5.5 at medium that names an item is L 3 and began by 2026-11-19T09:43Z, and v0.12.0, which moved L 3 to Fable 5.2 at low, was installed at 13:19:03Z that day. On an Opus 5.5 project no L now starts a worker on Opus 5.5 at medium; only a chunk without an item does. lilleman had the figures restart from that install, with a reset stamped 2026-11-19T13:19:03Z. loop-claude stamps these calls when the session that put them to lilleman ends, so their stamp is later than the time this note cites. + Valid while the index ranks these models, and while no newer model joins the catalog. ## routing: the offline classifier may decide finished, since lilleman ruled a miss rate of about 1 in 100 decided close enough to none; the judge's model keeps every other verdict kind