Answer prose round 1 and stability round 1: a suspension names the item that ends it, a release's last item is always measured, and CLAUDE.md says so
This commit is contained in:
+1
-1
@@ -65,7 +65,7 @@ lilleman decided to ship each of these under the floor on the day listed. Each l
|
||||
|
||||
## review: a project decision may suspend the scoring run for the plan items it names
|
||||
|
||||
2026-10-04, lilleman. Serves goal 4.4: in a restructure, each step scores against code the next step deletes, so the runs cost seats and stall each chunk under the floor without telling what the restructure buys; the panel at its end measures that. Valid while such a decision names its items and the panel that ends it.
|
||||
2026-10-04, lilleman. Serves goal 4.4. In a restructure, each step's scoring run measures code the next step deletes. It costs a run and blocks the step under the floor, yet says nothing about what the restructure buys. The scoring run or nine-seat panel after the last step measures that. Valid while such a decision names its items and the plan item that ends it.
|
||||
|
||||
## review: a pass skips only on a precedent: a decision, or a plan item crediting the pass, that the repo held before the chunk began
|
||||
|
||||
|
||||
Reference in New Issue
Block a user