Answer prose round 1: 0 🔴, 5 🟡; fold the changelog entry into the weights bullet, shorten the help and decision wording, correct items 191-194
This commit is contained in:
+1
-1
@@ -138,7 +138,7 @@ Valid while the ladder orders its rungs by competence.
|
||||
|
||||
2026-10-15, lilleman: the scores get a researched method, which `todo.md` items 149 and 151 build, after PR #283 shipped the ranking, PR #296 the risk scores and PR #298 the anchors each project names for each level in `docs/score-anchors.md`; the evidence is in `docs/scoring-and-goals-research.md`. R becomes L + E + I − 2: the chance the change holds a defect, set first by its size; the chance the defect escapes tests, review and monitoring; and the worst impact dimension, each about ×10 per level. I5, irreversible, holds R at 7 or more, and I4 at 5 or more, since a severe enough consequence outranks how unlikely it is. C goes from every table and tool: what it scored beyond size, spread and novelty, which L already holds, is complexity, which adds almost nothing once size is accounted for. Items rank by value per cost, V / 2^S, and V sums each cited achieve goal's weight times how far the item moves it. A goes, and the Audience says whose value the goals serve. R stays out of the ranking and sets how carefully an item is done; an item that lowers risk scores it as value. Each release fills by priority up to a capacity it states, in place of the bar. Each README goal is `maintain`, which vetoes an item that breaks it, or `achieve`, with a signal, a counter-signal and a one-line reason, as this README's Goals now mark them; each project keeps settled decisions to test its goals against. Each part of this method holds once the item that builds it ships. 2026-10-16, lilleman: a task's L and E + I pick its rungs in place of R, as `routing: one ladder` records.
|
||||
|
||||
2026-10-16, PR #283: items rank by `Score = 100 * V / 2**S`. 2**S is the cost; the 100 lets a score read to one decimal. V sums, over the achieve goals an item's Moves cell names, each goal's weight times how far the item moves it, 1 to 10. The goal ranked k of n achieve goals in reading order weighs 0.97 times the one ranked k - 1, the weights summing to 1 (lilleman, 2026-10-18, replacing the sum-reciprocal weight (1/k) / (1 + 1/2 + … + 1/n), under which the last of twelve goals weighed a twelfth of the first): goals matter almost as much as each other, each a small step below the one above, 5 goals weighing 0.212 down to 0.188 and 15 goals 0.082 down to 0.053. lilleman asked for a small step and the implementer picked 0.97; change it with the one constant, `GOAL_STEP`. The choice departs from `docs/scoring-and-goals-research.md`, which found sum-reciprocal weights fit the weights people gave best: the goals here are meant to count nearly alike, not to fit given weights. A Moves column replaces A, G and Goals, and `rank_todo.py` derives the weights from README.md, so the goal weights table and the 2026-10-08 weights are gone. An item that cited only maintain goals now names the achieve goal it moves, or, as a defect restoring one, that maintain goal, as the entry below says. A panel of three readers seated as lilleman picked the spelling: two put a Moves column holding `1.1 by 8, 1.2 by 5` first, and one put `1.1: 8` first; two chose `2**S`, since a Python reader takes `^` for XOR; all three chose one decimal of `100 * V / 2**S` over three significant digits or a log. The bar moved to 0.1, lilleman's call answering the review of PR #283: on one-decimal scores it drops an item scoring under 0.05, in practice one that moves no achieve goal, and item 149 revisits it. A table in the old shape still ranks by the formula and weights it states, and ranking it says to reshape it, so no other project's commits stop; reshaping it is that project's only work until done, as `CLAUDE.md` → "Working loop" says. PR #296 dropped the C column, and put L, E and I right before R, which `rank_todo.py` writes from them: of three readers seated as lilleman, two ranked that order first, since a reader meets each level before the R it builds and R sits beside S, and the third ranked it second, after an order with S before the levels. The old shape's ranking is valid until `todo.md` item 156.
|
||||
2026-10-16, PR #283: items rank by `Score = 100 * V / 2**S`. 2**S is the cost; the 100 lets a score read to one decimal. V sums, over the achieve goals an item's Moves cell names, each goal's weight times how far the item moves it, 1 to 10. The achieve goals in reading order each weigh 0.97 times the one before, and the weights sum to 1: 5 goals weigh 0.212 down to 0.188, 15 goals 0.082 down to 0.053. lilleman, 2026-10-18: goals should count almost alike, so this replaced the sum-reciprocal weight (1/k) / (1 + 1/2 + … + 1/n), under which the last of twelve goals weighed a twelfth of the first. The worker picked the step 0.97, and `GOAL_STEP` changes it. This departs from `docs/scoring-and-goals-research.md`, which found sum-reciprocal weights fit the weights people gave best; here the goals are meant to count nearly alike. A Moves column replaces A, G and Goals, and `rank_todo.py` derives the weights from README.md, so the goal weights table and the 2026-10-08 weights are gone. An item that cited only maintain goals now names the achieve goal it moves, or, as a defect restoring one, that maintain goal, as the entry below says. A panel of three readers seated as lilleman picked the spelling: two put a Moves column holding `1.1 by 8, 1.2 by 5` first, and one put `1.1: 8` first; two chose `2**S`, since a Python reader takes `^` for XOR; all three chose one decimal of `100 * V / 2**S` over three significant digits or a log. The bar moved to 0.1, lilleman's call answering the review of PR #283: on one-decimal scores it drops an item scoring under 0.05, in practice one that moves no achieve goal, and item 149 revisits it. A table in the old shape still ranks by the formula and weights it states, and ranking it says to reshape it, so no other project's commits stop; reshaping it is that project's only work until done, as `CLAUDE.md` → "Working loop" says. PR #296 dropped the C column, and put L, E and I right before R, which `rank_todo.py` writes from them: of three readers seated as lilleman, two ranked that order first, since a reader meets each level before the R it builds and R sits beside S, and the third ranked it second, after an order with S before the levels. The old shape's ranking is valid until `todo.md` item 156.
|
||||
|
||||
2026-10-16, lilleman, answering the review of PR #283. An item that restores a maintain goal the project breaks today is a defect: exempt as `defect`. Its Moves name that maintain goal and how much of it is broken, and the goal weighs as the heaviest achieve goal, since a broken maintain goal outranks any achieve goal. Every defect ranks by its score, so a trivial one waits behind valuable work. Only questions and then security findings rank first in their release: a question's answer may change other items, and a question waits for the human anyway, so ranking it first delays no chunk. An item names the most specific goal it moves, and a parent only for a move none of its sub-goals covers, so a sub-goal's move does not count twice; `rank_todo.py` refuses a goal named beside its own sub-goal. Each project reshapes its own `todo.md`; `CLAUDE.md` → "Working loop" makes the reshape the only work until done, as it makes writing missing premises. An item that makes this project easier to read moves goal 1.4 as well as 1.1, since reading cost is measured in tokens per chunk; a goal of its own for readability is left for later. Cost gains a fixed part, F in `Score = 100 * V / (2**S + F)`: every chunk carries a cost its size does not shrink, the reading before its first commit, about 130k tokens, and its review passes, so `2**S` alone overrated tiny items. F is 8, about one S 3 change, until `todo.md` item 158 measures it.
|
||||
|
||||
|
||||
Reference in New Issue
Block a user