Answer prose round 1: 0 🔴, 9 🟡 (0 misread); record why item 313 was dropped, tighten the decision's evidence and reorder the changelog

This commit is contained in:
2026-11-11 22:31:39 +01:00
parent 14ae30a731
commit f5201cb638
2 changed files with 11 additions and 5 deletions
+1 -2
View File
@@ -2,9 +2,8 @@
## Unreleased
- stability-reviewer, product-owner-reviewer and systems-architect have one-line descriptions, which shrinks the agent listing every session carries.
- Comprehension seats and larv-review's waves launch one agent of a type first and the rest in the next message, so they read its prompt cache.
- larv-review's worker now runs the project's tests and static analysis, and checks the docs for each name its change touches, before each stability round, and hands stability-reviewer the commit that passed; the reviewer doesn't run them again on it.
- stability-reviewer, product-owner-reviewer and systems-architect have one-line descriptions, which shrinks the agent listing every session carries.
- `mutate-changes` mutation-tests the lines a branch changes, running cargo-mutants, Infection, mutmut or Stryker by each file's language, and prints each mutant that no test kills. Where a project's README documents no mutation command of its own, larv-review now runs it before each stability round and hands stability-reviewer the mutants that survive.
- loop-claude now asks each worker to name the items its chunk takes on one line, as in `Chunk items: 12 (L 3, E + I 5), 14 (L 2, E + I 4)`, and scores them from `todo.md` on the default branch. That line, not the judge, now sets the items loop-inbox lists, and how far an item beyond the one the chunk was routed on lifts the worker, its reviewers and the judge. The judge still reports escalations and whether a release is ready to cut.
- `~/.claude` holds no `AGENTS.md` any more, so each session in your projects starts about 3,600 tokens smaller, and a session in `~/code/claude-config` loads its `CLAUDE.md` once instead of twice.
+10 -3
View File
@@ -25,6 +25,7 @@ Each project principle states one rule that the decisions below apply; their ent
- review: stability and product-owner report only a defect, a broken requirement of the plan or the goals, a breach of a technical principle, or for stability a hard place the change touches; each architect finding names a later change the PR makes harder; prose runs only on a chunk that changes prose
- review: the worker mutation-tests a chunk's changed lines before each stability round, in place of measuring test coverage
- review: the worker runs the project's tests and static analysis and checks the docs for each changed name before each stability round, and hands stability-reviewer the commit
- review: agents of one type launch in one message, not one a message before the others
- routing: a worker delegates a task only where it needs just the task's conclusion, and each subagent runs on the rung its task's L picks from the project's rung, never below the project's rung when it files or scores todo.md items
- routing: a worker hands a task one rung up on each escalation trigger, up to two rungs above the rung its item picks unless the human agrees, and opens the subagent's prompt with the trigger so the routing figures count it
- routing: a worker whose run ends asking for a higher rung, citing an escalation trigger the judge finds in the transcript, steps one rung up as the judge interrupts or quotes an answer, or next cycle, up to two rungs above the rung its item picks
@@ -353,11 +354,17 @@ Valid while a mutation run on a chunk's changed lines stays cheap beside the rev
## review: the worker runs the project's tests and static analysis and checks the docs for each changed name before each stability round, and hands stability-reviewer the commit
2026-11-11, lilleman through todo item 270, implemented by claude. Serves goal 1.4 and applies project principle 4: a check a program or the worker can run is run before review, and reviewers rule on the rest. Of the 148 stability and 75 product-owner round-2 reports modified in the 60 days before 2026-11-11, 73 and 18 new 🔴 and 🟡 findings were classified from their headings (a subagent's count by keyword, so a rough one). About 29% were an untested branch or surviving mutant and 9% a weak assertion, which `bin/mutate-changes` finds before review since item 293. About 21% were documentation that the change had made false, such as a README, CHANGELOG or help line naming a rule the code no longer follows; 1% were a lint or type error. The rest, edge-case logic (18%), false comments and wording, need judgement, so they stay with the reviewer. Stability reviewers ran the whole suite in 52 of this repo's 63 reports from the last 60 days, a run the worker's own run on the same commit repeats.
2026-11-11, lilleman through todo item 270, implemented by claude. Serves goal 1.4: a check the worker can run is run once before review, not in each reviewer's round. A subagent counted by keyword, from their headings, the new 🔴 and 🟡 findings in the stability and product-owner round-2 reports modified in the 60 days before 2026-11-11: 73 and 18, from 148 and 75 reports, so the shares are rough. About 29% were an untested branch or surviving mutant and 9% a weak assertion; `bin/mutate-changes` finds both before review since item 293. About 21% were a README, CHANGELOG, help line or comment that the change had made false, and 1% a lint or type error. The rest, edge-case logic (18%), false comments the change didn't cause and wording, need judgement, so they stay with the reviewer.
So the worker runs the suite and analysis, sweeps the docs for each name, flag, path and number the change touches, and hands the reviewer the passing commit. The reviewer runs them only for another commit. The sweep is the worker's reading, not a program, since a stale claim has no fixed spelling. The suite and analysis are each project's own, as its README documents them.
Stability reviewers ran the whole suite in 52 of this repo's 63 reports from the last 60 days, and the worker's run on the same commit gives the same result. So the worker sweeps for each name, flag, path and number the change touches, runs the suite and analysis as the project's README documents them, and hands the reviewer the passing commit; the reviewer runs them only for another commit. The sweep is the worker's reading, not a program, since a stale claim has no fixed spelling.
Valid while the worker's run on a commit finds what a reviewer's run on it would, and while docs-out-of-date findings in round 2 fall below the 21% measured.
Valid while the worker's run on a commit finds what a reviewer's run on it would, and while stale-doc findings in round 2 stay near the 21% measured.
## review: agents of one type launch in one message, not one a message before the others
2026-11-11, lilleman through todo item 313, dropped by claude after the stability review. Serves goals 1.4 and 1.5. Anthropic's prompt caching docs say a cache entry is readable only once the first response that wrote it has started, and item 313 measured 748 comprehension seats, 153 security passes and 130 general-purpose subagents that each wrote their own prefix, $99 from 2026-09-30 to 2026-11-11. Launching one agent of a type before the rest, to read its cache, doesn't pay: a foreground Agent call returns only when its agent has finished, and larv-review runs reviewers in the foreground, so each later launch group would wait one agent's whole run, a seat's median 1.6 minutes, to save a prefix of about 14k tokens. The stability reviewer also found, in the transcripts of 73 seats started within 90 seconds of an earlier seat, that each already read the shared prefix.
Valid while a foreground Agent call returns only when its agent has finished.
## routing: a chunk's worker runs on the rung its item's L picks, below the project's rung too; its reviewers run on the highest of the worker's rung, the project's and the one picked by the highest E + I among the chunk's items, unless a replay lowered their pass or the branch changes only Markdown no agent follows, which reviews on the project's rung; the seats and the security pass always on the project's