Drop item 52, shift 0.8.0 and 0.9.0 one release later, and plan the Fable 5.2 ladder for 0.8.0 #470

Merged
lilleman merged 4 commits from item-52 into main 2026-11-10 23:11:33 +01:00

4 Commits

Author SHA1 Message Date
lilleman d2ad46c9cb Cite the Working loop heading before its bold lead in item 292
CI / tests (pull_request) Successful in 2m22s
2026-11-10 23:08:43 +01:00
lilleman 03ee7a4a75 Answer prose round 1: 0 🔴, 0 🟡 (0 misread); no finding
CI / tests (pull_request) Failing after 2m15s
2026-11-10 23:04:04 +01:00
lilleman 79d764e682 Shift 0.8.0 to 0.9.0 and 0.9.0 to 0.10.0, plan the Fable 5.2 ladder for 0.8.0, and refresh ten stale details
CI / tests (pull_request) Failing after 2m34s
2026-11-10 23:03:05 +01:00
lilleman 6440824f27 Drop item 52: obsolete 2026-11-10 23:03:05 +01:00