Merge a project's chunks one at a time, finishing each one's plan items in its turn #554

Merged
lilleman merged 11 commits from item-374 into main 2026-11-15 22:32:07 +01:00

11 Commits

Author SHA1 Message Date
lilleman 70e3c0b9de Answer overrides round 1: 0 🔴, 0 🟡 (0 misread); the override of the rank check is accepted
CI / tests (pull_request) Successful in 2m24s
2026-11-15 22:28:08 +01:00
lilleman 93a4da0728 Record the comprehension check: a scoring run at bcb04e3, overall 6.00; refresh floor item 300
CI / tests (pull_request) Successful in 2m23s
2026-11-15 22:27:10 +01:00
lilleman bcb04e32d4 Finish item 374 in the plan, and record lilleman's answer on the paired ruling's base
CI / tests (pull_request) Successful in 2m35s
2026-11-15 22:19:02 +01:00
lilleman 37fcedc5bf Merge remote-tracking branch 'origin/main' into item-374
CI / tests (pull_request) Successful in 2m44s
2026-11-15 22:11:23 +01:00
lilleman e18555be3e Answer product-owner round 2: 0 🔴, 1 🟡 (0 misread); the base of a rerun paired ruling is asked of lilleman
CI / tests (pull_request) Successful in 2m25s
2026-11-15 22:11:22 +01:00
lilleman 2136413dd6 Answer stability round 2: 0 🔴, 4 🟡 (0 misread); each survivor it named has a test that kills it 2026-11-15 22:11:22 +01:00
lilleman e37518db29 Answer prose round 1: 0 🔴, 11 🟡 (0 misread); the help lists merge's steps and stops, and the decision says where it differs from the call
CI / tests (pull_request) Successful in 2m45s
2026-11-15 21:56:11 +01:00
lilleman 9e0a6d4d7b Answer product-owner round 1: 1 🔴, 5 🟡 (1 misread); an absent item is named, an approved pull request answers its comments first, and todo-item keeps its own checks 2026-11-15 21:56:11 +01:00
lilleman aff46cd64e Answer stability round 1: 2 🔴, 8 🟡 (1 misread); the scoring-run gate follows the finish, a rerun commits what a finish left, and the queue wait ends after 30 minutes 2026-11-15 21:56:11 +01:00
lilleman 0109f97cd7 Answer security round 1: 0 🔴, 0 🟡 (0 misread); nothing reported
CI / tests (pull_request) Successful in 2m8s
2026-11-15 21:34:51 +01:00
lilleman 85f3b74d4f Merge a project's chunks one at a time, finishing each one's plan items in its turn
CI / tests (pull_request) Successful in 2m9s
2026-11-15 21:33:36 +01:00